MAPC issued RFQ under the Operational Services Statewide Contract for an engineering and design consultant to assist MAPC, the City of Chelsea, and the City of Everett conduct an alternatives analysis to identify a preferred alignment or routes from the end of the Chelsea Greenway to Broadway in Everett and on to the Northern Strand Trail. Budget is $84,000.
For RFQ documents contact Travis Pollack at tpollack@mapc.org
Chelsea Everett Greenway Consultant RFQuotes 2024.08_Final-1.pdf